Bathrooms:
![]() |
In-line drain, shower-pan, cement boarded. All ready for inspection. |
![]() |
Started tiling in the guest bathroom. |
Floor, floor boards and door casings:
![]() |
Replace casings on all doors. |
![]() |
Floor boards and casings are from the same flat wood (to be painted as the wall). |
Kitchen cabinets:
Mostly installed. Haha. And I thought it would take 5 days back in early September...
Front door:
![]() |
New casing and glass blocks covered. More wall!!!! yay. |
And this is the situation at the 3rd mensiversary.