Three months have passed, the project should be at it's 3/5 point, provided there are no further delays due to any unforeseen circumstances... Another inspection is scheduled for tomorrow. In the mean time here is the current status.

Bathrooms:

In-line drain, shower-pan, cement boarded. All ready for inspection.

Started tiling in the guest bathroom.


Floor, floor boards and door casings:

Replace casings on all doors.

Floor boards and casings are from the same flat wood (to be painted as the wall).


Kitchen cabinets:

Mostly installed. Haha. And I thought it would take 5 days back in early September...

Front door:

New casing and glass blocks covered. More wall!!!! yay.

And this is the situation at the 3rd mensiversary.