Saturday, October 20, 2012

Drainage

Aside from pouring concrete along the badly saturated area, the drainage system along the other side of the house is done. Now the long tubes that were siting in the trench are connected to the down spouts. Looking tucked and cleaned.



There are some more drainage work to be done on the other side in addition to the concrete slab. The kitchen exhaust is also installed all in preparation for the upcoming rain next week.

Actually this whole week I've been struggling with colors for the exterior, but I now have to concentrate on the interior color choice first as no painting outside until the rainy days are over.