Wall hung toilet stayed. Guest bathroom has been redesigned. Blah.
A shelf is going to be mounted under the mirror unit instead of extending from the sink.
Tiles are going to flush with an additional built out gypped board to avoid round ends.
This translate to having extra gyp board on the mirror side and the door side, which means the door frame has to be changed too. I swear, this bathroom is the most troublesome.




The walls that are going to be tiled have been prepped to have one layer of water proofing sheet and one layer of cement board. The hole on the ground is also filled with concrete. And of course the tub is in.







As for the master bath, the shower pan is built, in-line drain, water proofed and should be ready to add the cement board next. The old toilet is finally out.





Next Monday is the beginning of tile work.